Independent news, explained properly

Latest
News

No trains between London and Bedford on the Midland Main Line on 5 and 6 December

East Midlands Railway passengers will be sent via Hitchin and Thameslink will run buses north of Mill Hill Broadway while Network Rail works on track, drainage and signalling.

A train station with a train on the tracks
Photo: Blake Sherman / Unsplash

Trains will not run between Bedford and London on the Midland Main Line over the weekend of Saturday 5 and Sunday 6 December, Network Rail said on Tuesday. Engineering work will close all lines in the Luton area.

East Midlands Railway has no trains between London St Pancras International and Bedford all weekend. Rail replacement buses link Bedford and Hitchin, and EMR tickets are accepted at no extra cost on Great Northern and Thameslink trains between Hitchin and London.

Thameslink has no trains between Mill Hill Broadway and Bedford from Saturday until 05:30 on Monday 7 December. Buses run between Mill Hill Broadway and Luton, between Luton Airport Parkway and Bedford on a fast route, and between Luton and Bedford calling at all stations. Further buses connect Harpenden with Potters Bar via St Albans City, and Luton Airport Parkway with Hitchin via Luton, so passengers can pick up other Thameslink and Great Northern trains into London. Elsewhere Thameslink runs a revised timetable, with trains between Brighton or Three Bridges and Mill Hill Broadway, Gatwick Airport or Three Bridges and London Bridge, Kentish Town and Rainham in Kent, and from Sutton to West Hampstead Thameslink via Mitcham Junction and to London Blackfriars via Wimbledon.

Thameslink expects journeys to take much longer than usual, and both operators are asking people to check before setting off.

The work

Network Rail is grouping several jobs into the one closure. More than 400 metres of track will be renewed in Belsize Tunnel in London and 740 metres at Sundon High Bridge, north of Luton. Engineers will lay 500 metres of drainage at Harlington in Bedfordshire and bring 10 renewed signalling location cabinets into use at St Albans.

The weekend will also move on two larger projects: an accessible footbridge with three lifts at Luton station, built under the Access for All programme, and new points, cabling, telecoms and signalling for the strategic rail freight interchange under construction at Radlett in Hertfordshire.

Network Rail's national helpline is 03457 11 41 41.